Coking and Gasification Agenda

Day 1 - 20 April 2010

08.30

Registration

09.00

Welcome remarks

09.10

Future of petroleum coke from a global perspective
JACOBS CONSULTANCY

09.50

Gasification to meet refinery hydrogen, electricity and steam demands: availability vs costs

  • Evaluating how flexible the gasification plant may be to meet fluctuations in refinery demands for hydrogen, steam and electricity
  • Presenting the results of the availability study performed by Foster Wheeler, aimed at assessing availability of the three products to the refinery via different gasification plant configurations

FOSTER WHEELER

10.30

Coffee break and opportunity to visit the exhibition

11.00

Shell gasification technology – part of refinery upgrading strategies

  • Designed for low oxygen consumption and generation of high amount of CO and H2
  • Shell’s experience with gasification as plant operator, different refinery residues processed with Shell’s technology
  • Analysing important integration criteria and different refinery upgrading schemes

SHELL

11.40

Cost effective solutions to support your operations

  • Need for innovation to optimise costs and operations
  • DC –top and bottom unheading technology

ZIMMERMANN & JANSEN

12.20

Lunch and opportunity to visit the exhibition

13.30

Design and start-up of state-of-the-art delayed cokers

  • Cost effective project execution approaches
  • BP Whiting Refining delayed coking unit is being constructed on a totally modular basis
  • Evaluating issues associated with the design and construction of modern delayed coking units

FOSTER WHEELER

14.10

Developing the right project criteria
Speaker to be confirmed

14.50

Coffee break and opportunity to visit the exhibition

15.20

Application of Cetek’s matrix coating system to coker heaters

  • Improves the uniformity of the heat flux distribution
  • Reduces the peak to average flux ratio in process tubes of single fired heaters
  • Reduces the maximum tube skin temperature, increases run length and charge rate

FOSBEL

16.00

Panel discussion: Overcoming coking and gasification challenges in today’s market

Speakers from the day will gather to answer your questions

16.40

End of day one

17.00

Cocktail reception